{"id":47557,"date":"2020-01-13T15:35:56","date_gmt":"2020-01-13T14:35:56","guid":{"rendered":"https:\/\/rijeka2020.eu\/djecja-kuca-usla-u-zavrsnu-fazu-gradevinskih-radova\/"},"modified":"2020-01-22T17:34:38","modified_gmt":"2020-01-22T16:34:38","slug":"the-childrens-house-construction-works-enter-the-final-phase","status":"publish","type":"post","link":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/","title":{"rendered":"The Children&#8217;s House construction works enter the final phase"},"content":{"rendered":"<p>The tour was attended by the Mayor of Rijeka Vojko Obersnel, the President of Rijeka City Council Andrej Poropat, Heads of the Culture and Utility Services Departments Ivan \u0160arar and Irena Mili\u010devi\u0107, the CEO of RIJEKA 2020 and the Head of the \u201cChildren&#8217;s House\u201d flagship Emina Vi\u0161ni\u0107 and Jelena Mili\u0107, on behalf of the constructor ING-GRAD d.o.o., Construction Site Manager Borna Ve\u010denaj and Head Construction Works Supervisor Zrinka Brki\u0107 from ZEM nadzor d.o.o..<\/p>\n<p>All the construction works on the building are now completed, and they included securing the structure of the Brick Building, assembling the load-bearing and partition columns, concreting the floor structures and the roof panel, the assembly of the mezzanine of the 4th floor, window installation preparatory works, steel facade gratings, and the finishing and painting of the ceilings inside the house.<\/p>\n<p>Currently, craft work is in progress on all floors, along with the finishing of the reinforced concrete walls, assembly of the secondary framing for the partition walls, the fire-resistant coating of the steel construction, thermal insulation of the floor structures, making cement screeds for the floor structures, the preparation of suspension for the electrical, water supply and sewage installations, and preparations for mechanical installations.<\/p>\n<p>Construction will end with the installation of exterior joinery, the construction of a portion of the roof above the steel structure of the 4th floor, and the restoration of a section of the front fa\u00e7ade of the building.<\/p>\n<p>According to Zrinka Brki\u0107, Head Construction Works Supervisor, most of the problems in the reconstruction of the building were caused by groundwater and high rainfall, but these setbacks had little actual effect on the planned schedule, meaning that the construction and craft works will soon be finalised.<\/p>\n<blockquote><p>\u201cEver since contractors entered the facility in March of last year, nobody dared to believe that the works would progress at such a fast pace, and it can be expected that the Children&#8217;s House will be opened in June, as planned,\u201d said the Mayor of Rijeka Vojko Obersnel on the occasion, adding that this one-of-a-kind Croatian project will fit in perfectly with Rijeka\u2019s art neighbourhood that found its place inside the Ben\u010di\u0107 complex.<\/p><\/blockquote>\n<p>The Head of the City\u2019s Department of Culture, Ivan \u0160arar, expressed his satisfaction in these words:<\/p>\n<blockquote><p>\u201cOf all the things we are doing, the Children&#8217;s House gives me the most joy, it is \u2018everyone\u2019s favourite\u2019 part of the Ben\u010di\u0107 neighbourhood. While the City Library and museums are typical cultural institutions, the Children\u2019s House is an adventure and none of us are completely sure what it is will look like once it opens,\u201d said \u0160arar, adding that the future children\u2019s cultural hub will house three cultural institutions &#8211; Art Kino, the Rijeka City Library, and the Rijeka City Puppet Theatre with their partners.<\/p><\/blockquote>\n<p>Noting that these institutions offer extensive children\u2019s programmes even as we speak, \u0160arar mentioned the fact that the stronger infrastructural support will foster the further development of the said programmes, and he added that for children, growing up in Rijeka will undoubtedly reach new heights of quality.<\/p>\n<p>Among other activities surrounding the upcoming programme and infrastructural segment of the Rijeka 2020 \u2013 European Capital of Culture project, the opening of the Rijeka City Museum at the Sugar Refinery Palace was announced for April of 2020. This building of the former Ben\u010di\u0107 complex is currently being furnished, while all the construction works have been finalised.<\/p>\n<p>Moreover, Mayor Obersnel announced a spectacular opening ceremony of the European Capital of Culture programme on 1 February in the Port of Rijeka, stating that the programme will consist of many elements, such as a dedication to the industrial history of Rijeka in the form of an opera, a big fireworks show, and a surprise that is still being kept under wraps, to name but a few.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-46685 size-full\" src=\"https:\/\/rijeka2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-6.jpg\" alt=\"\" width=\"1200\" height=\"800\" srcset=\"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-6.jpg 1200w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-6-640x427.jpg 640w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-6-1024x683.jpg 1024w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-6-768x512.jpg 768w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-6-250x167.jpg 250w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-6-420x280.jpg 420w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p><strong>Children&#8217;s House &#8211; the future hub of children\u2019s cultural activities<\/strong><\/p>\n<p>The content of the Children\u2019s House will be intended for the age group ranging from 0 to 12, while the programmes will feature much more than just content that can be watched, listened to or read, as the children themselves will get the chance to create, devise, share and receive the cultural activities being implemented there. All of this is aimed at fostering their creativity in an interactive manner.<\/p>\n<p>Some of the activities envisioned for this hub of children\u2019s culture in the making include creating animated movies in a movie studio, making video reports, creating music in a music studio, playing video games on the big screen of the screening hall, creating video games, product design and 3D printing, storytelling theatre in the small amphitheatre on the roof of the house, &#8220;sweet\u201c interactive baby theatre, doll-making, &#8220;sensory\u201c theatre for children with a special emphasis on working with children with developmental disabilities, customised movie screenings for children with developmental disabilities, daily movie screenings for children, the playroom at the library etc. and more.<\/p>\n<p>This HRK 162123324.61 million redevelopment project is part of the project entitled Revitalisation of the Ben\u010di\u0107 Complex &#8211; the Brick and the T-shaped Buildings. The City of Rijeka has received EU funding for this project in the form of a grant amounting to HRK 68206564 million. The remaining part of the investment is financed by the City of Rijeka in the form of a loan share amounting to HRK 98706500 and by funds from the EU Projects Co-financing Fund amounting to HRK 10 million. The construction works began on March 11, upon the signing of the contract with ING-GRAD construction company in January 2019. The works on the Children\u2019s House amounting to HRK 43.4 million are carried out by the Zagreb-based construction company ING &#8211; GRAD, while the construction work supervision services, amounting to HRK 319,000, are provided by ZEM nadzor d.o.o. It is estimated that the furnishing of the Children\u2019s House will cost HRK 8.2 million.<\/p>\n<p>The Brick Building was constructed at the end of the 19th century as part of the then Royal Hungarian Tobacco Factory on the site of two older buildings. According to a map of the complex from the year 1875, there were two smaller buildings on the site of today\u2019s Brick Building, one of which was used as a water mill on the Brajda brook. Originally, it was connected by bridges to the H-shaped Building on the southern side, and to the now-demolished building on the north-eastern side. After the end of World War II, the Brick Building became part of the newly-formed \u201cRikard Ben\u010di\u0107\u201d Factory of Motor Machines and it was abandoned after the demise of the factory in the 1990s. Its architectural and historical merit lies in the fact that it is an example of industrial architecture from the late 19th century and of the typology of warehouse buildings of the time.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-46691 size-full\" src=\"https:\/\/rijeka2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-15.jpg\" alt=\"\" width=\"1200\" height=\"800\" srcset=\"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-15.jpg 1200w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-15-640x427.jpg 640w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-15-1024x683.jpg 1024w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-15-768x512.jpg 768w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-15-250x167.jpg 250w, https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-15-420x280.jpg 420w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Along with the renovation of the Brick Building \/ Children\u2019s House within the former Rikard Ben\u010di\u0107 industrial complex, Rijeka\u2019s first ever art neighbourhood will also include the soon to be Rijeka City Museum in what used to be the Sugar Refinery Palace, the new headquarters of the Rijeka City Library in what used to be the \u201cT-shaped Building\u201d, and the already open Museum of Modern and Contemporary Art in the former \u201cH-shaped Building\u201d. Infrastructure construction and landscaping works are also well underway on 15700 square metres of public spaces. The total investments into the former industrial complex amount to HRK 250 million.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Children\u2019s House that is being constructed as part of the European Capital of Culture project is undergoing final construction works before it enters the interior furnishing phase. During a tour of the construction site on 13 January at the former Rikard Ben\u010di\u0107 industrial complex, representatives of the city of Rijeka, RIJEKA 2020 and reporters were briefed about the current state of what will become the Children\u2019s House, the first ever multifunctional location of its kind in Croatia.<\/p>\n","protected":false},"author":72,"featured_media":46683,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3055,2731],"tags":[],"class_list":["post-47557","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-childrens-house","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Children&#039;s House construction works enter the final phase &#8226; Rijeka 2020<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Children&#039;s House construction works enter the final phase &#8226; Rijeka 2020\" \/>\n<meta property=\"og:description\" content=\"The Children\u2019s House that is being constructed as part of the European Capital of Culture project is undergoing final construction works before it enters the interior furnishing phase. During a tour of the construction site on 13 January at the former Rikard Ben\u010di\u0107 industrial complex, representatives of the city of Rijeka, RIJEKA 2020 and reporters were briefed about the current state of what will become the Children\u2019s House, the first ever multifunctional location of its kind in Croatia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/\" \/>\n<meta property=\"og:site_name\" content=\"Rijeka 2020\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/rijeka2020\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-13T14:35:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-22T16:34:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Rijeka 2020\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Rijeka2020\" \/>\n<meta name=\"twitter:site\" content=\"@Rijeka2020\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Rijeka 2020\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/\"},\"author\":{\"name\":\"Rijeka 2020\",\"@id\":\"https:\/\/ri2020.eu\/en\/#\/schema\/person\/9c12d91df8c45bc534f625d9c81f403d\"},\"headline\":\"The Children&#8217;s House construction works enter the final phase\",\"datePublished\":\"2020-01-13T14:35:56+00:00\",\"dateModified\":\"2020-01-22T16:34:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/\"},\"wordCount\":1247,\"publisher\":{\"@id\":\"https:\/\/ri2020.eu\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg\",\"articleSection\":[\"Children's House\",\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/\",\"url\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/\",\"name\":\"The Children's House construction works enter the final phase &#8226; Rijeka 2020\",\"isPartOf\":{\"@id\":\"https:\/\/ri2020.eu\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg\",\"datePublished\":\"2020-01-13T14:35:56+00:00\",\"dateModified\":\"2020-01-22T16:34:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#primaryimage\",\"url\":\"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg\",\"contentUrl\":\"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ri2020.eu\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Children&#8217;s House construction works enter the final phase\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ri2020.eu\/en\/#website\",\"url\":\"https:\/\/ri2020.eu\/en\/\",\"name\":\"Rijeka 2020\",\"description\":\"Europska prijestolnica kulture\",\"publisher\":{\"@id\":\"https:\/\/ri2020.eu\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ri2020.eu\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ri2020.eu\/en\/#organization\",\"name\":\"Rijeka 2020 d.o.o.\",\"url\":\"https:\/\/ri2020.eu\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ri2020.eu\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/rijeka2020.eu\/wp-content\/uploads\/2018\/07\/Ri2020-logo.png\",\"contentUrl\":\"https:\/\/rijeka2020.eu\/wp-content\/uploads\/2018\/07\/Ri2020-logo.png\",\"width\":407,\"height\":175,\"caption\":\"Rijeka 2020 d.o.o.\"},\"image\":{\"@id\":\"https:\/\/ri2020.eu\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/rijeka2020\",\"https:\/\/x.com\/Rijeka2020\",\"https:\/\/www.instagram.com\/rijeka2020\/\",\"https:\/\/www.youtube.com\/user\/riepk2020\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/ri2020.eu\/en\/#\/schema\/person\/9c12d91df8c45bc534f625d9c81f403d\",\"name\":\"Rijeka 2020\",\"url\":\"https:\/\/ri2020.eu\/en\/author\/lsm\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Children's House construction works enter the final phase &#8226; Rijeka 2020","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/","og_locale":"en_US","og_type":"article","og_title":"The Children's House construction works enter the final phase &#8226; Rijeka 2020","og_description":"The Children\u2019s House that is being constructed as part of the European Capital of Culture project is undergoing final construction works before it enters the interior furnishing phase. During a tour of the construction site on 13 January at the former Rikard Ben\u010di\u0107 industrial complex, representatives of the city of Rijeka, RIJEKA 2020 and reporters were briefed about the current state of what will become the Children\u2019s House, the first ever multifunctional location of its kind in Croatia.","og_url":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/","og_site_name":"Rijeka 2020","article_publisher":"https:\/\/www.facebook.com\/rijeka2020","article_published_time":"2020-01-13T14:35:56+00:00","article_modified_time":"2020-01-22T16:34:38+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg","type":"image\/jpeg"}],"author":"Rijeka 2020","twitter_card":"summary_large_image","twitter_creator":"@Rijeka2020","twitter_site":"@Rijeka2020","twitter_misc":{"Written by":"Rijeka 2020","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#article","isPartOf":{"@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/"},"author":{"name":"Rijeka 2020","@id":"https:\/\/ri2020.eu\/en\/#\/schema\/person\/9c12d91df8c45bc534f625d9c81f403d"},"headline":"The Children&#8217;s House construction works enter the final phase","datePublished":"2020-01-13T14:35:56+00:00","dateModified":"2020-01-22T16:34:38+00:00","mainEntityOfPage":{"@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/"},"wordCount":1247,"publisher":{"@id":"https:\/\/ri2020.eu\/en\/#organization"},"image":{"@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#primaryimage"},"thumbnailUrl":"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg","articleSection":["Children's House","News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/","url":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/","name":"The Children's House construction works enter the final phase &#8226; Rijeka 2020","isPartOf":{"@id":"https:\/\/ri2020.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#primaryimage"},"image":{"@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#primaryimage"},"thumbnailUrl":"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg","datePublished":"2020-01-13T14:35:56+00:00","dateModified":"2020-01-22T16:34:38+00:00","breadcrumb":{"@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#primaryimage","url":"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg","contentUrl":"https:\/\/ri2020.eu\/wp-content\/uploads\/2020\/01\/Obilazak-gradili\u0161ta-Dje\u010dje-ku\u0107e-2.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/ri2020.eu\/en\/the-childrens-house-construction-works-enter-the-final-phase\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ri2020.eu\/en\/"},{"@type":"ListItem","position":2,"name":"The Children&#8217;s House construction works enter the final phase"}]},{"@type":"WebSite","@id":"https:\/\/ri2020.eu\/en\/#website","url":"https:\/\/ri2020.eu\/en\/","name":"Rijeka 2020","description":"Europska prijestolnica kulture","publisher":{"@id":"https:\/\/ri2020.eu\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ri2020.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ri2020.eu\/en\/#organization","name":"Rijeka 2020 d.o.o.","url":"https:\/\/ri2020.eu\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ri2020.eu\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rijeka2020.eu\/wp-content\/uploads\/2018\/07\/Ri2020-logo.png","contentUrl":"https:\/\/rijeka2020.eu\/wp-content\/uploads\/2018\/07\/Ri2020-logo.png","width":407,"height":175,"caption":"Rijeka 2020 d.o.o."},"image":{"@id":"https:\/\/ri2020.eu\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/rijeka2020","https:\/\/x.com\/Rijeka2020","https:\/\/www.instagram.com\/rijeka2020\/","https:\/\/www.youtube.com\/user\/riepk2020"]},{"@type":"Person","@id":"https:\/\/ri2020.eu\/en\/#\/schema\/person\/9c12d91df8c45bc534f625d9c81f403d","name":"Rijeka 2020","url":"https:\/\/ri2020.eu\/en\/author\/lsm\/"}]}},"_links":{"self":[{"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/posts\/47557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/users\/72"}],"replies":[{"embeddable":true,"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/comments?post=47557"}],"version-history":[{"count":2,"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/posts\/47557\/revisions"}],"predecessor-version":[{"id":47559,"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/posts\/47557\/revisions\/47559"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/media\/46683"}],"wp:attachment":[{"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/media?parent=47557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/categories?post=47557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ri2020.eu\/en\/wp-json\/wp\/v2\/tags?post=47557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}